Wastewater Pretreatment System Installation

This project began when the client approached PCD seeking assistance with a wastewater treatment system evaluation. The facility was preparing to invest in a system upgrade and was looking to confirm/construct their design inlet characteristics. After an intense analysis of their numerous waste streams, a plan was devised that allowed for some reuse opportunities and water reduction efforts. PCD continued to assist by providing a detailed engineering design, cost analysis, and risk assessment. The ultimate treatment choice was a ferrihydrite chemical treatment system. PCD continued to provide procurement, project management, and construction oversight for the duration of the installation. After the system was installed, PCD assisted with startup and provided operator training so that the client could run the system in compliance.